| 12-Feb-07 Early in the morning, John Janssen and his Malavoca crew getting organised to do the final stage of the car park before the top coat surface.
|
|
| 13-Feb-07 Paul Hidding setting out the driveway for Malavoca.
|
|
| 12-Feb-07 Tom VanDerSchaaf, plumber, doing the storm water and Malavoca site works - behind large hall and creche.
|
|
| 12-Feb-07 Tom does use a shovel too!
|
|
| 12-Feb-07 Brett from Malavoca working his grader. Trenching for carpark tree reticulation.
|
|
| 12-Feb-07 Main church lighting mostly installed
|
|
| 12-Feb-07 Brett can get his grader in tight spaces! He is grading the limestone base under the covered portico drive-through to be brick-paved later.
|
|
| 16-Feb-07 Kyle VanDerLinden driving the compaction roller.
|
|
| 16-Feb-07 Tony DeMan and Mike Cheekes setting out and screeding the sand base for the brick paving busy bee tomorrow (Saturday 17 February).
|
|
| 16-Feb-07 Foyer acoustic ceiling and organ recess installed ready for flush jointing.
|
|
| 16-Feb-07 Organ recess as viewed from inside the main nave. Note this wall and ceiling is 2-hour fire rated, and lined with 2x16mm layers of Firetek Gyprock.
|
|
|