|
| Church pad from the side showing the floor slope
|
|
| pad showing toilets and kitchen
|
|
| Showing sewer connections to the outside toilets
|
|
| view from the front of the church
|
|
| Showing complete pad from behind the pulpit area
|
|
| help for laying the services
|
|
| service trench showing the sewer
|
|
| Craig Vanderschaaf laying the 150mm blue water main to the fire hydrant. The other black pipe is the water pipe that supplies the church building with water.
|
|
| Levi Kleyn helping out
|
|
| Service trench with the power cabling. The white comms (telstra) cabling can be seen on the side, and was laid a little later at a shallower depth than the power.
|
|
|